Projects
- Core production/development projects - in proven basins with existing infrastructure and strong markets
- Cambay, India (OEX 45%, Operator):
- Current oil production of ~4-600 bopd from 2 wells from 1 horizon (MBS) constrained by facilities
- Oil case proven from 3 horizons
- MBS production expected to grow to ~3,000 bopd during 2009
- 2C – 3C contingent resources of 43 – 137 mmstboip*, not including MBS
- Gas development to follow, remaining 2C–3C contingent resources of 109 – 286 bcfgip#. Appraisal wells in 2009.
- West Kampar, Indonesia (OEX 45%):
- Pendalian-3 test est. rate at ~1,200bopd. Production of up to 2,000bopd from 2 wells in Q1 2009
- Resources best estimate of 14mmstboip
- Reviewing equity position for possible farmdown
- Block 56, Oman (OEX 25%, Operator):
- Sarha-2 extended well test postponed
- Test Program to be carried out on Al Jumd well
- Reviewing data from 7 well drilling program
- Exploration upside in offshore Australasian blocks
- JPDA 06 103
- 3D coverage now available over 90% of the block
- Initial interpretation identified numerous structures
- 2 well drilling program planned for 3Q 2009
- Reviewing equity position for possible farm down
- WA-388-P
- Large LNG scale geological structures identified
- 3D seismic program acquired
- Drill or drop decision later in 2009 following interpretation
* mmstboip – million stock tank barrels oil in place
# bcfgip – billion cubic feet gas in place
Click on this link to view Latest Activity